New Construction Home Inspection in Three Phases
A brand-new home still needs an inspection. Production builders move fast, and the county’s code inspections check for minimum code compliance, not for workmanship. A new construction home inspection from Groff Inspections checks the house on your behalf at three points in the build, so defects get documented while the builder is still responsible for fixing them.
With a background in construction, we know what a rushed job looks like and what can get overlooked or covered up in the process.
The Three Phases We Inspect
Most clients who hire us for one phase hire us for all three. Each visit catches problems the others can’t.
Phase 1: Pre-drywall
Once framing, rough plumbing, rough electrical, and HVAC ducts are in, but before insulation and drywall cover them, we inspect the structure inside the walls. This is the only time those parts of the house can be seen. Details are on our pre-drywall inspection page.
Phase 2: Final walkthrough
Before closing, we inspect the finished home the same way we would any home, plus the cosmetic details that matter on a new build. The final home inspection on new construction gives you a written list to take into your builder walkthrough, instead of trying to spot everything yourself in 30 minutes.
Phase 3: 11-month warranty
Florida requires builders to provide a one-year warranty. About one month before it expires, we inspect again to catch what showed up after a year of living in the home. See our 11-month warranty inspection page.
We don’t offer pre-pour inspections of the foundation forms. Our three phases start once the house is framed.

What the Final Walkthrough Inspection Covers
The final walkthrough phase has no separate page because it’s the heart of this service. It happens after the builder says the home is complete and before you close. We inspect the finished house system by system, then adds the new-build details a resale inspection wouldn’t focus on:
- Roof and attic. Covering damage from installation, attic insulation depth and coverage, and ventilation.
- Exterior. Grading and drainage away from the foundation, stucco and paint, and sealant at windows and doors.
- Windows and doors. Operation, locks, glass damage, and weatherstripping.
- Electrical, plumbing, and HVAC. Outlets, GFCI protection, fixtures, water heater, leaks under sinks, and whether the air conditioning is cooling properly.
- Interior finishes. Drywall, flooring, cabinets, countertops, trim, and paint overspray.
- Appliances. Built-in appliances are operated to confirm they work.
You’ll have the report in hand before your builder’s orientation, so you can walk the house with a documented list instead of a memory.
What We Find on New Builds
These are issues we document regularly on newly built homes in Southwest Florida:
- Missing or displaced insulation in the attic or behind walls
- Damaged roof covering, including cracked or broken tiles and lifted shingles
- Broken or damaged windows, including cracked panes and damaged frames
- Framing, fastener, and connector issues that are only visible before drywall
- Plumbing leaks under sinks, at fixtures, and around water heaters
- Damaged flooring, including scratches, chips, cracked tile, and gaps
- Damaged paint, including scuffs, drips, thin coverage, and missed spots
- Cosmetic issues in drywall, trim, cabinets, and countertops
Unlike an inspection on an existing home, a new construction report points out cosmetic issues too. When the house is new, those details are the builder’s to fix.
Why It Matters Before You Close
Once you close, every deficiency in the house becomes yours to deal with. The builder’s warranty covers a lot during the first year, but only for problems that are identified and reported. A written, photo-documented report gives you something specific to hand the builder, and it’s far harder to dismiss than a verbal complaint during a walkthrough. Dated photos also help if a warranty item is questioned later in the year.
If you’re still deciding whether an inspection is worth it on a brand-new house, read do you need an inspection on new construction.
How New Construction Inspections Work With Your Builder
- Tell your builder early. Let your builder’s sales rep or superintendent know you’ve hired your own inspector, and ask to be notified when the house is ready for the pre-drywall visit.
- We schedule each phase. We book each visit when the house reaches that stage, typically within one to five days of your call.
- Same-day reports. Each phase report is emailed to you the day of the inspection, with photos you can forward to the builder.
- We explain the findings. We call you after each report so you know what to ask the builder to fix and what’s normal for that stage.
Just signed a contract on a new build? Call (941) 299-1688 or email info@groffinspections.com and we’ll plan all three visits around your build schedule.
Schedule Your Inspection
Most inspections are scheduled within one to five days, and every report is delivered the same day.
- Licensed Florida home inspector (HI16718)
- 10 years in construction before inspecting
- Same-day reports on every inspection
- A follow-up call to walk through your findings
You Hire Us, Not the Builder
Builders don’t typically hire the home inspector, and that’s the point. Groff works for the buyer. Our only job is to document the house accurately for you, and that independence is why the report carries weight when you hand it to your builder. Many of our new construction clients are referred by the real estate agents who work with local builders’ sales teams, and agents can learn more on our for real estate agents working new communities page.
Building in one of the new communities north of Sarasota? See our new construction inspections in Parrish page.
Why Buyers Choose Groff for New Construction Inspections
- A builder’s eye. Ten years in residential, commercial, and industrial construction before inspecting.
- Licensed in Florida. Home inspector license HI16718.
- Same-day reports for every phase. You never wait on a report while the builder keeps building.
- Photos the builder can act on. Each finding is photographed and located.
- A call after each report. You’ll know what to push for and what’s normal at that stage.
New Construction Inspection FAQ
County inspections check that the work meets minimum code at specific stages. They aren’t a detailed look at workmanship or finish quality on your behalf. Our inspections cover what you’re paying for as the buyer.
No, you can book any phase on its own. Most buyers choose all three because each one sees things the others can’t.
Most builders allow a buyer’s inspector with notice. Ask early, get the answer in writing, and ask how they want visits scheduled.
It comes to you the same day. You forward it to your builder, and the builder addresses the items under your contract and warranty.
Generally not. Those insurance reports are usually requested on existing homes. Your insurance agent can confirm what your carrier needs.
The pre-drywall visit is usually shorter than the final because there are no finishes or appliances to check. The final walkthrough takes about as long as a standard home inspection of the same size. The 11-month visit falls in between.
Plan Your New Construction Inspections
The best time to call is right after you sign. That way, we’re ready when the framing is up, at your final walkthrough, and before your warranty ends.
Schedule your new construction inspections by calling (941) 299-1688 or emailing info@groffinspections.com.